banner.jpg

AKWIRE for IBM Maximo Case Study - Aviation R&D Facility

Cutting-Edge Aviation R&D Facility Cuts Scheduling Time and Gets the Analytics They Need to Analyze Assets

Better Planning and Scheduling increases innovation and supports new product development.

Overview

At this world-leading aviation research and development facility, it wasn't the volume of maintenance work orders that was causing scheduling headaches; it was the ineffective and outmoded scheduling tools that were taking up dozens of hours of employee time to create a simple schedule.
This case study explores how this aviation R&D facility uses the AKWIRE Visual Suite, including MPower, vScheduler, vCalendar and vJobPlan, to decrease scheduling time and to create the in-depth analytics reports they need to monitor their assets.

Challenge

  • Lack of visibility of resource availability
  • PMs "slipping through the cracks"
  • 20+ hours/week of manually copying and pasting data
  • Difficulty reviewing and analyzing metrics
Solution
  • Decrease time-to-schedule
  • Create custom reports and layouts for better data visibility
  • Gain the ability to schedule by Craft
Results
  • 90% time savings scheduling
  • Custom layouts and reports
  • Improved decision-making
  • Almost 100% PM compliance
How did this aviation R&D facility improve their data visibility to get the metrics they needed, all while slashing time-to-schedule so that staff gained back hundreds of hours they can now use to focus on data analysis?

Download the detailed case study now



 

Industry: Aviation Research and Development
Location:
Delaware
Maximo Profile:
IBM Maximo Asset Management 7.5, soon to be 7.6.

A world-leading provider of commercial, military, business and general aviation engines and components, our client serves markets around the globe with their electrical power and mechanical systems for aircraft.

Download Product Brochures