| Version 4.0 - Released - May
2008 |
 |
| |
The following are the
features that were added to Version 4.0 to deliver outstanding performance and add many
new usability improvements:
- New QuickFind and QuickFilter functions to quickly locate the data you need within the Gantt.
- New Custom Assignment window to assign multiple resources to several tasks in a single action.
- New Gantt Summary window to dynamically display summary information as tasks are being selected, such as the total number of hours per craft, to help you quickly decide which tasks you need to reschedule.
- New
Published Status view to quickly see which schedule items have been modified
within AKWIRE™; so you know exactly which work orders will be updated back into Maximo®.
- Auto-split tasks based on different criteria such as percent completed.
- Change the status of multiple work orders in a single action.
- Date constraint enforcement on work orders. For example: MustStartOn, MustFinishOn, FinishNoLaterThan, and more.
- Keep track of your resources unavailable time. This allows the planner/scheduler to account for other work related activities that may have an impact on the resource availability, such as being away on training.
- Ability to 'skip' a PM. For example: skipping the 13th monthly PM in your calendar year by setting it to not publish back into MaximoŽ.
- Ability to organize your work items within the Gantt into different groups.
- Load existing schedules within a master schedule to view the overall workload, with the ability to modify them from the master schedule.
- Improved user rights for better control over what each type of user is allowed to do when working with the schedule.
- User rights make full use of your current MaximoŽ groups and security.
- Improved printing to allow a planner/scheduler to print multiple Gantts at once, with added control over the page setup to remove margins and repeating headers, for easier pasting on a wall.
- Enhanced Gantt filtering based on your selection.
- Support for displaying your MaximoŽ KPIs within the Metrics Bar.
- New option to reset your work orders target dates as you publish them back into MaximoŽ.
- Optimized for greater performance.
|
| |
|
| Version 3.1 - Released -
November
2007 |
| |
The following are the features that
were added to Version 3.1 based on the great customer feedback that
we received:
- Multi-selection of schedule items.
- A new menu item to Select All/Deselect All Gantt items.
- Change task durations from the Gantt.
- Microsoft® Outlook® style Group By functionality added to the
Gantt column area to help you quickly organize your work by
type, asset, priority, and attributes of your choice.
- Change the status of a work order from the Gantt.
- Move tasks within the labor view of the Gantt.
- Assign a task to another labor using drag & drop.
- Dropping a task on top of another will push all adjacent tasks
to the right.
- Support for linked tasks.
- Re-order schedule items by dragging and dropping rows from the
Gantt.
- Option to display the resource names assigned to each tasks in
the Gantt.
- Option to display summary bars of all children activity on the
parent row of the Gantt so the user can see when there is activity
without having to expand a row.
- Split tasks within the Gantt using the mouse with the ability
to specify split durations when Auto-Splitting tasks.
- Auto-split work orders based on Assignments within MaximoŽ.
- Gantt now has a separate region for displaying fields so that
when scrolling, the fields are kept into view.
- Two new data views have been added: MaximoŽ Scheduled vs.
MaximoŽ Actual and MaximoŽ Target vs. MaximoŽ Actual.
- The Data Selection tab now incorporates a SQL Helper view to
help with entering the criteria and sort order for selecting the
right data for a schedule. Those filters can be saved for
later retrieval.
- Multi-threaded support now allows cancelling a running query in
the Data Selection tab.
- Create new work orders/tasks from the Gantt; for example, a
user can plan an entire shutdown without even going into MaximoŽ.
- Auto-schedule feature has been expanded to allow a user to
specify which day(s) to 'fill' with tasks.
- Auto-schedule the work orders based on labor availability.
- Display multiple Gantts and arrange them in a desired layout
with the ability to save those layouts and reuse them.
- Auto-scroll to the nearest schedule item with a double click of
the mouse.
- Auto-filtering Gantt rows based on current row or date
selection. For example, only display work orders having
planned labor for selected Craft(s) and/or activities on selected
days.
- Publish only the selected PMs/WOs as opposed to all items in
the schedule.
- Optimized parts of the code such that the application is still
very responsive with large amount of data.
- Planning and scheduling of Tools and Materials; ability to see
the availability of your tools.
|
|